Welcome!

I'm building an RV-10. I've finished the empennage and wings. I am currently working on the firewall forward kit. I'm at that 90% done stage with 90% left to do. I hope to be completed by Thanksgiving, but only time will tell if I can meet that goal.

This site will chronicle my family's activities in building a four place 200 mile per hour RV-10 experimental aircraft. When complete it will look similar to the picture above.

The picture (taken by Doug Reeves) is of Tim Olson's RV-10. More information about the build process can be found on Tim's site (myrv10.com). Janice and I were fortunate in that Tim gave us a ride at Airventure 2008 in his RV-10. Both Janice and I had large RV grins when we landed.


Bob


Recent Activity
First Photo
Date

Work Log Summary

The next time these are assembled, it will be the final time
05-13-2012
Fairings and Tail Removal

05-12-2012
Fairings, Nose Wheel Pant, Tail Electrical, Cabin
Elevators
05-11-2012
More Sanding & Micro
Headliner marked for trimming
05-10-2012
Rear Window, Headliner, and Wheel Pants

05-08-2012
Fairings and more Fairings

05-07-2012
Empennage Fairing
Empennage Fairing
05-06-2012
Some riveting, some sanding, more micro, and more
Dana and I riveting the last top skin
05-05-2012
Last fuselage skin and more fairing work
The last skin to rivet
05-04-2012
A bunch of misc tasks
GPS Antenna cable run vertically up the bulkhead support
05-03-2012
Countersink APRS Doubler & Pull GPS Antenna Cable

05-02-2012
Ground Power & Rudder Fairing

05-01-2012
Aux Battery Charger
Vertical Stab Fairing
04-30-2012
Vertical Stab Fairing and Battery Ground Terminal
What a mess!!!
04-29-2012
Battery Connections and Fairing Sanding
Schottky diodes mounted
04-28-2012
Ground Power & More Fairing Sanding

04-27-2012
Ground Power Plug & Fairing Sanding
ELT Doubler riveted
04-26-2012
ELT Doubler and Vertical Fairing
Top skin and doublers primed
04-24-2012
GPS Doublers #2 and More Micro
The two GPS antenna
04-23-2012
GPS Doublers

04-22-2012
More micro filler and dimple top skin

04-21-2012
ELT Installation

04-20-2012
ELT Bracket
04-19-2012
Steve Stella

04-18-2012
Installing adel clamps in the tail
Vertical wire run to the overhead
04-16-2012
Overhead Wiring











Copyright © 2001-2012 Matronics. All Rights Reserved.