KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site

Builder:
Dave Conwell
Location:
Peru, IN - USA
Aircraft:
Sonex Aircraft, LLC - Sonex Aerovee Tri-gear
Manufacturer:   
http://www.sonexaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
1158 Hours

Welcome to my experimental aircraft Web site.

Recent Activity
 Date Hours Work Log Summary Details
 02-16-2019
3.0
Installed The Windshield Hoop.
Details
       

 02-12-2019
3.5
Cut My Pattern For The Gear Leg Fairings.
Details
       

 02-07-2019
2.0
Bondo Filler To Smooth The Edges Of The Pod To The
Details
       

 02-04-2019
2.0
Bond Position Light Pods To The Wing Tips.
Details
       

 01-22-2019
1.5
Cut The Wingtip For The Position Light Pods.
Details
       

 01-21-2019
1.8
Prepared The Position Light Pods And Wing Tips.
Details
       

 01-09-2019
2.3
Prepared Position Lights.
Details
       

 11-30-2018
0.0
3 Month Break After Surgury.
Details

 11-24-2018
1.3
Poster Board Cutout Of Gear Leg Fairing Installed.
Details
     

 11-23-2018
2.5
Cut Landing Gear Fairing From .025 Sheet.
Details
       










Copyright © 2001-2019 Matronics. All Rights Reserved.