KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten

Builder:
Robert Lussow
Location:
Sunman, IN - USA
Aircraft:
Vans - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
1485 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 06-24-2017
1.5
Install Cowling
Details
       

 06-23-2017
1.6
Install Cowling
Details
       

 06-18-2017
1.3
Install Spinner Back Plate, Oil Quick Drain
Details
       

 06-12-2017
1.0
Oil Pickup Line
Details
       

 06-09-2017
1.0
Install Oil Cooler Lines
Details
       

 06-03-2017
1.0
Install Forward Footwell Access Panel
Details
       

 06-01-2017
0.5
Install Rear Seat Shoulder Harness Cables
Details

 06-01-2017
1.0
Install Fresh Air Valve Wiring
Details

 05-27-2017
1.5
Install Oil Pickup Line, Alternator Bushing, Prop
Details
       

 05-19-2017
1.0
Install Alternator
Details










Copyright © 2001-2017 Matronics. All Rights Reserved.