KitLog pro

Powered By Kitlog Pro v2.0

ERIK'S WEB SITE

Builder:
Erik Heller
Location:
Winsted, CT - USA
Aircraft:
Van's Aircraft - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-

Welcome to my experimental aircraft Web site. I will be (slowly) building the Van's Aircraft RV-7.

Recent Activity
First Photo
Date

Work Log Summary


04-04-2010
Polishing the Vertical Stabilizer
Assembly finished
03-31-2010
Finishing the Vertical Stabilizer
Skin riveted on to skeleton
03-19-2010
Finishing the Vertical Stabilizer
Front spar and ribs sealed and clecoed
03-16-2010
Finishing the Vertical Stabilizer
Rear spar sealed and riveted
03-15-2010
Finishing the Horizontal Stabilizer
Dimpled and primed
03-14-2010
Drilling the Vertical Stabilizer
Spars and doubler primed
03-13-2010
Drilling the Vertical Stabilizer
Right side
03-10-2010
Drilling the Vertical Stabilizer
Ribs and spars final drilled
03-09-2010
Drilling the Vertical Stabilizer
Brackets match drilled
03-08-2010
Drilling the Vertical Stabilizer
Left bottom horizontal stabilizer
02-25-2010
Riveting the Horizontal Stabilizer
Left bottom
02-24-2010
Riveting the Horizontal Stabilizer
Top left side
02-23-2010
Riveting the Horizontal Stabilizer
Left HS-706 riveted to HS-702
02-22-2010
Riveting the Horizontal Stabilizer
Right side
02-21-2010
Riveting the Horizontal Stabilizer
Left side with support ribs still clecoed in.
02-20-2010
Riveting the Horizontal Stabilizer
Rear spar and front spar riveted
02-19-2010
Riveting the Horizontal Satbilizer
left horiz stab spars and reinforcement bars primed.
02-18-2010
Preparing the Horiz Stab for Assy
Left horiz stab skin dimpled and primed
02-11-2010
Preparing the Horiz Stab for Assy
Right horiz stab skin and reinforcement bars primed
02-10-2010
Preparing the Horiz Stab for Assy
Right side deburred and dimpled
02-09-2010
Preparing the Horiz Stab Parts for Assy
Left side ribs deburred and dimpled
02-08-2010
Preparing the Horiz Stab Parts for Assy
Skin clecoed onto the skeleton
02-07-2010
Drilling the Horizontal Stabilizer
Just prior to skin and inboard ribs
02-06-2010
Drilling the Horizontal Stabilizer
Reinforcement bars shaped, match drilled to trimmed spar channels
02-05-2010
Front Spar Assembly / Preparing the Ribs











Copyright © 2001-2012 Matronics. All Rights Reserved.