Brief Description: Drilling the Vertical Stabilizer
Clecoed the VS-808PP spar doubler to the VS-803PP rear spar then clecoed on the hinge brackets VS-410PP, VS-411PP and VS-412P. Final drilled VS-808PP, VS-410PP, VS-411PP and VS-412PP to VS-803PP. Match drilled the two remaining holes in the upper VS-410PP. Fluted the VS-704, VS-705, VS-706 and VS-707 ribs. Clecoed the ribs to the VS-803PP rear spar and VS-702 front spar.