KitLog pro

Powered By Kitlog Pro v2.0

ERIK'S WEB SITE
' style=
Date:  3-8-2010
Number of Hours:  1.00
Manual Reference:  6-4
Brief Description:  Drilling the Vertical Stabilizer

Clecoed the VS-808PP spar doubler to the VS-803PP rear spar then clecoed on the hinge brackets VS-410PP, VS-411PP and VS-412P. Final drilled VS-808PP, VS-410PP, VS-411PP and VS-412PP to VS-803PP. Match drilled the two remaining holes in the upper VS-410PP. Fluted the VS-704, VS-705, VS-706 and VS-707 ribs. Clecoed the ribs to the VS-803PP rear spar and VS-702 front spar.
' style=

Brackets match drilled

Brackets match drilled

' style=

Skeleton clecoed together

Skeleton clecoed together

' style=

Another view of the skeleton

Another view of the skeleton

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.