Date |
Hours |
Work Log Summary
 |
Details
 |
08-03-2009
|
4.5
|
S/B Doubler Retrofit
|
Details
|
  |
|
08-01-2009
|
2.5
|
Empennage Service Bulletin Repair
|
Details
|
  |
|
07-31-2009
|
4.0
|
Mounted Fuselage On "rotisserie"
|
Details
|
  |
|
05-18-2008
|
5.0
|
Prepped And Riveted The Rear Bulkhead; Rejoined Th
|
Details
|
|
|
05-17-2008
|
5.0
|
Disconnect Tail From Fuse; Final Prep For Perm Att
|
Details
|
  |
|
05-16-2008
|
1.5
|
Drilling And Countersinking The Left Side Skins; M
|
Details
|
  |
|
05-14-2008
|
2.5
|
Drilling And Bolting The Mid-fuse And Tail Section
|
Details
|
|
|
05-13-2008
|
2.5
|
Joining The Fuselage And Empennage For The 1st Tim
|
Details
|
 |
|
05-12-2008
|
2.0
|
Moved The Fuselage Onto Pallets; Preparing The Bul
|
Details
|
  |
|
05-11-2008
|
4.0
|
Finishing Removing The Forward Top Skin From The E
|
Details
|
  |