| Date: |
2-2-2013 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Prepairing the elevator bearing bracket |
|
|
The elevator breaing bracket must sit flat on T.E. Spar surface. One side is drilled, the other must be match drilled. Left as much powder coat as I could while surfacing the brackets to get them to sit flat. I clamped them together on a mechinest granet to ensure the two flages where flush,then match drilled. I will prime them to match the rest of the parts later. |
||