Date:    1-30-2013
Number of Hours:    2.00
Brief Description:    Horizontal Stab Begins!
Built a fixture to hold the two parts of the spar in alignment while drilling. This piece of wood will become the base of the fixture that will hold the stab true while match drilling....More to come on that later.