| Date: |
7-5-2012 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Hinge layout on Vertical Stab T.E. Spar |
|
|
This is my second vertical stab. Made a list of all the things I wanted to do differently. This time, I choose to drill the hinge schedule first and THEN drill the rivet pattern. This ensured that the hinges where on center line and in correct position. |
||