| Date: |
1-29-2011 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Gear install |
|
|
Finished installing tension cable on rear gear hoop and final install of landing gear, powder coated the two small bushings for the rear gear/frame attachment. Removed drip from powder coating on left tail tube and sanded down to match surrounding area. |
||