Date:    11-5-2011
Number of Hours:    2.50
Brief Description:    Governor box, governor wiring
Jeweled the aluminum, RF governor enclosure box and governor mounting plate. Installed the 8 port RF filter strip into the mounting plate and bolted on the governor.

Made up a jumper to connect the K & L terminals per the wiring diagram.

Started fabricating jumper wires from the RF strip to the governor terminal strips using 20 gauge wire and #6 ring terminals with the other end wrapped and soldered onto the RF filter posts.