| Date: |
11-5-2011 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Governor box, governor wiring |
|
|
Jeweled the aluminum, RF governor enclosure box and governor mounting plate. Installed the 8 port RF filter strip into the mounting plate and bolted on the governor. Made up a jumper to connect the K & L terminals per the wiring diagram. Started fabricating jumper wires from the RF strip to the governor terminal strips using 20 gauge wire and #6 ring terminals with the other end wrapped and soldered onto the RF filter posts. |
||