| Date: |
7-2-2011 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Oil tank, Clutch |
|
|
Sanded down the seam on the oil tank using the belt sander then finish sanded to a smooth radius by hand. Began mocking up the mount straps for the oil tank using thin aluminum which I will duplicate in steel once proper fit is achieved. I will have two straps on top and two on the bottom. Began assembling the clutch now that the parts are painted. Used two C clamps to squeeze the rubber donut enough to get the cross bolt installed. Still need to polish the aluminum parts then the clutch can be completed. |
||