Date:    7-2-2011
Number of Hours:    4.00
Brief Description:    Oil tank, Clutch
Sanded down the seam on the oil tank using the belt sander then finish sanded to a smooth radius by hand.

Began mocking up the mount straps for the oil tank using thin aluminum which I will duplicate in steel once proper fit is achieved. I will have two straps on top and two on the bottom.

Began assembling the clutch now that the parts are painted. Used two C clamps to squeeze the rubber donut enough to get the cross bolt installed. Still need to polish the aluminum parts then the clutch can be completed.