| Date: |
5-29-2011 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Seatpan paint, Cyclic rigging |
|
|
Sanded and texture painted the back and bottom of the seat pan in areas that will be visible with the cabin installed. Re-adjusted the cyclic L/R travel after talking to the checkout pilot. He suggested reducing the stick tilt at level swash from 3 degrees right to 1 degree. I still need to re-work the stop bolt so I will have 6 degrees L/R at the swash again. |
||