| Date: |
3-18-2011 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
More tail rotor work |
|
|
Turned down the radius of the fender washers and coined washers that secure the tail slider and ball links to allow additional clearance for maximum slider travel. Re-installed the washers. Safety wired the six cap head screws on the tail rotor hub barrel. Drilled safety wire holes in the tail rotor pitch arms. |
||