Date:    2-26-2011
Number of Hours:    4.00
Brief Description:    Installing control tubes
Installed the remaining four rivets in the pedal scissor arm bearing flange.

Final installed control tube ends torquing cross bolt nuts to 40 in/lbs.

Final installed the walking beams to the frame.

Installed the swash and attached the cotrol tubes ready to adjust travel and rigging.