| Date: |
1-7-2011 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Inst. Panel construction |
|
|
More locating of instruments, resized and cut out pictures of instruments to determine clearences. Screwed panel down to a piece of trupan and clamped it on the mill bed. Cut four 2.04" holes for engine instruments. Cut 2.875" hole for rotor tach. |
||