| Date: |
1-8-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Riveted leading edge of left wing and installed hi |
|
|
We flipped the wing over and the riveted the leaded edge in the called out locations. Then I installed hinge rib assemblies into the wing. I am going to move on to the right wing now as I am waiting for the dual landing light kit to be available from Vans and I dont want to close the wings before installing lighting. Also I want to wait for my tech advisor to get back in town to look at wings before they are closed. |
||