| Date: |
2-25-2019 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Reconstruction of left elevator constuction |
|
|
Cleco outer ribs and counterweight skin to elevator skin. Match drill ribs. Drill the #12 holes in the counter weight skin (Counter weights had previously been drilled. Cleco root rib and spar to elevator skin and match dril. |
||