| Date: |
6-19-2020 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Bottom skin and tank attachment |
|
|
Lined up the marked locations and drilled the overlaping bottom skin between wings and fuselage. Drilled the #30 holes between the two in preparation for the screw locations Layed out the 863 tank brackets and started fabricating the brackets. Band saw struggled though the thick C channel material. (Went in search of new band saw blades, no luck I'll have to order one on line) |
||