| Date: |
2-26-2020 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
hardware assemble for forward baggage door |
|
|
After a shoulder separation and surgery along with physical therepy and 4 months of down time; I'm back to building Drill out snap bushings for the 5/16" push rods that lock the baggage door closed. Ream out the lock fitting and debur. Silicone in the lock assembly and bolt into place. Adjust smooth action of the locking pins and lock. Attache the push rod assembly to the lock assembly. |
||