| Date: |
6-26-2018 |
|
| Number of Hours: |
3.25 |
|
| Brief Description: |
Match drilling and clecoing |
|
|
Match drilled the left and right tail side skins for the mid and lower longerons. Finished drilling all #30 and #40 holes in tail section including bulkheads Debured the 810 bulkhead pice and clecoed the top plate and bulhead into place Match drilled the bottom skin 822 to the left and right bottom mid skin 826 and 827 that attach to the main 804 bulkhead. Clecoed into place the top skin for the fuselage. (Encouraging to see it come together) |
||