| Date: |
6-20-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Drilling the forward uper Longerons and forward sk |
|
|
Aligning and clamping during the drilling of the upper longeron with the forward skins as well as the top of the longeron. (It was slow going, since you are drilling clecoing, and drilling and clecoeing each hole) |
||