| Date: |
4-10-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
clecoed the floor assembly and match drilled botto |
|
|
Riveted the 5 nutplates in both left and right angles that attach to the seat ribs. Match drill the #30 holes in the floor bulkhead and 815,814 and 813 ribs where they attach to the bulkhead. flute the skin to form a radius to follow the forward ribs. Clecoed the skin and rib assembly. Match drilled the #40 holes in the ribs/skin |
||