Date:    3-5-2018
Number of Hours:    6.50
Brief Description:    Forward floor assembly
Finished up riveting the firewall assembly, except for the two uper corners (13) point that are asked to wait for further structure.

Began assembly of the floor. Debured the pieces and match drilled the assembly. (match drilled the nutplates and countersink the angle structure)