Date:    1-29-2018
Number of Hours:    2.00
Brief Description:    Riveting the bottom skin
Working my way into the outbound side of the bottom skin.

I also received the reduction hardware to connect the pitot tube from the 5/16" pitot tube line to the 1/4" plumbed line. flared the lines and connected the caps w/ sleeves to each line.