| Date: |
12-20-2017 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Assembly of the bell crank and push rods for the l |
|
|
Bolting on the bell crank assembly. I had to ream out the connecting rod for the brass bushing. Greesed it up manufactured the required spacer and tourqed the bolts to specification |
||