| Date: |
5-5-2017 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Rivet leading edge, route stall warning wiring |
|
|
Finished riveting the left leading edge. Mounted leading edge to the main spar assembly. Grommet bushing added to ribs for routing the Stall Warning wiring. Set up the right leading edge for riveting. Riveted the front two rivets on the top and bottom sides of the Right leading edge assembly. |
||