| Date: |
3-15-2017 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Seal and rivet in 2nd rib on left tank |
|
|
This was the last interior rib for the fuel tanks. Sealed and riveted into place. Also riveted in the angle bracket for the anti obstruction bracket to the interior rib |
||