| Date: |
2-6-2017 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Fabricate the two attachement angles |
|
|
Fabricated the attachement angles for the fuel tanks from aluminum angle. Also the backing plate for the attachment angles to connect to the inbound ribs for fuel tanks. |
||