| Date: |
12-24-2016 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Skin preparation and Right fuel tank assembly |
|
|
Peel back rivet spans protective coating on wing skins. Disassembled the Left tank assembly for deburing / counterskinging. Assembled the Right fuel tank assembly. Drill dobler between tank and leading edge assembly. removed assembly and match drill right fuel tank. |
||