Date:    12-24-2016
Number of Hours:    7.00
Brief Description:    Skin preparation and Right fuel tank assembly
Peel back rivet spans protective coating on wing skins. Disassembled the Left tank assembly for deburing / counterskinging. Assembled the Right fuel tank assembly. Drill dobler between tank and leading edge assembly. removed assembly and match drill right fuel tank.