| Date: |
10-24-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Electrical pumbing |
|
|
I finally got the flex conduit lines run in both righ and left wing spars. Drilled out the remaining 3/4" holes in lower ribs and pulled the conduit through. Purchased knockout drill bit |
||