Date:    8-18-2016
Number of Hours:    2.00
Brief Description:    Rear spar assembly rework
After inpecting the rivet quality on the rear spar doubler plate I determined that In needed to drill out about 20 rivets. Drilled out the dome heads and rocked off the shop head.