| Date: |
8-18-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Rear spar assembly rework |
|
|
After inpecting the rivet quality on the rear spar doubler plate I determined that In needed to drill out about 20 rivets. Drilled out the dome heads and rocked off the shop head. |
||