| Date: |
6-23-2016 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Bolt on the tie down assemblies |
|
|
Match dril/final dril the bolt sizes on both the right and left wing spars. Bolt tie down assembly to specified torque levels. Including bolting on the hing assemblies |
||