| Date: |
12-23-2015 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Match drill right side of the horizontal stabilize |
|
|
Match drill skin on the right side of the horizontal stabilizer Finish all match drilling and mounting of spars for the horizontal stabilizer disassemble horizontal stabilizer |
||