| Date: |
10-31-2015 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
ADAHRS |
|
|
Fabricated brackets and installed the Dynon ADAHRS. Installed OAT probe and connected all wiring and plumbing to the ADAHRS. Leveled the mounting platform to all 3 axis. Once the airplane is flying shims can be used to make minor adjustments to the mounting to insure that the ADAHRS is parallel to all 3 axis. |
||