| Date: |
2-27-2017 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
clecoed elevator frame together ,drilled. Fabricat |
|
|
Clecoed and match drilled E-601PP and E-611PP to E-702 and E-00001A & B Fluted E-703 and E-704 ribs Clecoed E-703 and E-704 ribs to E-702 spar and match drilled. Removed ribs from spar. Installed E-714 counterweight to front of ribs and clecoed on E-713 skin to secure it. Drilled pilot holes for E-714 E-713, then removed E-714 to drill hoes out on drill press. Replaced E714 and used it as a pilot to drill holes through to front of ribs E-703 and E-704 Trimmed E-714 to size by drilling a 1/2 inch hole for a radius then the band saw to square it off. |
||