Date:    1-12-2017
Number of Hours:    7.00
Brief Description:    Started Vertical Stab
Started Vert stab.
Deburred VS-803PP and VS808PP. Clecod Aft spar together along with mounting hinge brackets
Match drilled aft spar and brackets.
Deburred forward spar and all ribs..
assembled Vert stab frame with ribs to front and aft spar.
Match drilled ribs to spars.

Fluted ribs