Date:    1-20-2018
Number of Hours:    4.00
Brief Description:    Tunnel wiring
Continued to prep tunnel wiring. Made 0.75 x 0.75 based for the stanfoffs to route the cable bundles in the stiffener cutouts below the fuel pump. Bonded in place on the lower skin; waiting to cure