| Date: |
1-20-2018 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Tunnel wiring |
|
|
Continued to prep tunnel wiring. Made 0.75 x 0.75 based for the stanfoffs to route the cable bundles in the stiffener cutouts below the fuel pump. Bonded in place on the lower skin; waiting to cure |
||