| Date: |
12-27-2017 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Power and ground wiring I |
|
|
Began the installation of the four 8x fuse blocks on the sub panel; the sub panel is dedicated to power distribution. Ran the feed from the master relay to the fuse panel Installed the "forest of tabs" on the inner firewall and fabricated a jumper from the battery to give it an excellent low impedance ground. |
||