Date:    11-25-2017
Number of Hours:    9.00
Brief Description:    Finish GAD27 wiring; start the tray
Completed the wiring to GAD27 and the to termininal block and laced the final bundles. This was a tight fit; if I had to do it over, maybe a different place would be better, though it did minimize the amount of wiring going all the way to the panel.

Began drilling of the avionics tray for the radio/transponder/EIS stack and the connectors that will mate with cables coming up from the aft end