| Date: |
11-25-2017 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
Finish GAD27 wiring; start the tray |
|
|
Completed the wiring to GAD27 and the to termininal block and laced the final bundles. This was a tight fit; if I had to do it over, maybe a different place would be better, though it did minimize the amount of wiring going all the way to the panel. Began drilling of the avionics tray for the radio/transponder/EIS stack and the connectors that will mate with cables coming up from the aft end |
||