| Date: |
1-28-2017 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Baffle prep - airbox fram |
|
|
Fabricaed the frame for the filter airbox that will mount to a front ramp of the baffle set. Drilling and final assembly will happen when the baffles go in. |
||