| Date: |
4-30-2020 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Pitot/static and transponder checks |
|
|
Bjorn from our local travelling pitot/static check station ran a full IFR pitot/static check and transponder check and calibrated the G3X. Though not IFR (yet) it's nice to know that the pitot/static system is tight and fully functional. |
||