| Date: |
4-18-2020 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Boots and Seals |
|
|
Did a full wipedown and vacuum of the plane, all panels out in prep for inspection. Added pushrod boots on aileron pushrods, left and right; easy install. Finished lower cowl inlet seal baffles and test fit; built an help er tool to ease the transition over the inlet ramps. |
||