Date:    4-13-2019
Number of Hours:    3.00
Brief Description:    Finish snorkel; add alt air intake
Finish up the last details onthe snorkel .. final triming and sealing. Added the alt air door to the side of the snorkel just in case the filter gets clogged/blocked.