| Date: |
12-29-2019 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
Rebuild left elevator II |
|
|
Finished rebuild of the left elevator in about 3 days of focused work. Build quality was better than the original, now that I know what I'm doing. Elevator fitup on the Emp is complete and is "good as new" I was able save the trim tab from the original though. |
||