| Date: |
11-17-2019 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Install tail |
|
|
Install horizontal and vertical stabs, elevators. Start to fit the top fairing, initially with a liquid shim layer between the fairing and control surfaces. |
||