| Date: |
9-1-2018 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Route EGT and CHT wiring |
|
|
Terminate EGT and CHT probes. Routed the thermocouple wire through the feedthrough and to the cylinders. Crimped on ring terminals and attached them to the pre-installed terminals on the EGT/CHT probles. Carefully routed the wires in parallel with the spark plug wiring for a neat and tidy install. |
||