| Date: |
8-4-2018 |
|
| Number of Hours: |
5.50 |
|
| Brief Description: |
Install exhaust stack (first time) |
|
|
Installed the exhaust stack to the freshly mounted engine. Following plans, the exhaust stud bolts were greased with high temp Permatex anti-sieze paste and set up finger tight. Installed the crossover trombones, also with anti-sieze. Used mouse mik on the ball sockets. Fabricated and installed all hangars and supports for the pipes near the cowl exit. |
||