| Date: |
11-22-2015 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Elevator attach drillings |
|
|
Drilled the brackets into the longerons for forward and aft horzontal stab. Installed the VS and drilled the upper attach bracket (took 3 tries to get this one right) All edge distances were carefully checked and came out with good margin. |
||