| Date: |
7-1-2015 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Flap linkage install and flap housing parts |
|
|
Installed and drilled the delrin block for the flap torque tube. It took a bit of gentle cajoling to get the tube into position. Fabricated all the "make from" parts for the flap actuator assembly. |
||