Date:    7-1-2015
Number of Hours:    5.00
Brief Description:    Flap linkage install and flap housing parts
Installed and drilled the delrin block for the flap torque tube. It took a bit of gentle cajoling to get the tube into position. Fabricated all the "make from" parts for the flap actuator assembly.